| CENTRIFUGAL PUMP DESIGN | RADIAL FLOW |
| CENTRIFUGAL PUMP IMPELLER QUANTITY | 1 |
| CENTRIFUGAL PUMP IMPELLER SUCTION TYPE | SINGLE |
| COOLING METHOD | SELF VENTILATED |
| CRITICALITY CODE JUSTIFICATION | ZZZY |
| CURRENT RATING IN AMPS | 82.5 |
| CURRENT TYPE | AC |
| DISCHARGE CONNECTION QUANTITY | 1 |
| DISCHARGE CONNECTION TYPE | ROUND FLANGE |
| DISCHARGE PRESSURE | 90.0 POUNDS PER SQUARE INCH GAGE |
| ENVIRONMENTAL PROTECTION | DRIPPROOF |
| FREQUENCY IN HERTZ | 60.0 |
| INCLOSURE TYPE | PARTIALLY INCLOSED |
| INTAKE CONNECTION QUANTITY | 1 |
| INTAKE CONNECTION TYPE | ROUND FLANGE |
| MAXIMUM DISCHARGE FLOW RATE | 850.0 GALLONS PER MINUTE |
| MEDIA FOR WHICH DESIGNED | WATER, FRESH |
| OPERATING SPEED AT RATED CAPACITY | 3540.0 REVOLUTIONS PER MINUTE |
| PHASE | THREE |
| PRIME MOVER COOLING MEDIUM | AIR |
| PRIME MOVER QUANTITY | 1 |
| PRIME MOVER TYPE | ELECTRIC MOTOR |
| PUMP QUANTITY | 1 |
| PUMPING ELEMENT OPERATING POSITION | VERTICAL |
| REFERENCE NUMBER DIFFERENTIATING CHARACTERISTICS | TRIDENT PLANNED EQUIPMENT REPLACEMENT (TRIPER) AND ADVANCED EQUIPMENT REPAIR PROGRAM (AERP) PROCEDURES IAW NAVSUP WSS INST 4420.170 OPERATING PROCEDURE 3. INCLUDES BOTH L1/SS/Q3/Q5/SOC AND NON-L1/SS/Q3/Q5/SOC TRIPER/AERP COMPONENTS. TRIPER/AERP EQUIPMENT HAVE SPECIAL REQUIREMENTS BUT NO SPECIFIC MATERIAL CONTROL |
| STAGE QUANTITY | 1 |
| TOTAL HEAD | 208.000 FEET |
| VOLTAGE IN VOLTS | 440.0 |